How to cut your wireless and EMI/EMC compliance costs

Supplied by Vicom Australia Pty Ltd on Wednesday, 25 May, 2016


Failing verification or qualification of wireless technologies within a new product design increases developmental costs and delays the product release. Similarly, an EMI compliance test is expensive and also puts the product schedule at risk.

Download this white paper to learn how to set up your own pre-compliance testing to isolate problems areas and rectify before you go to a compliance test house.


Related White Papers

How to leverage the re-emergence of DC high-voltage distribution

Learn about three operational topologies, pertinent examples and techniques that can be...

Which is better to protect your PCB — coating or resin?

The design of the PCB, the housing and the anticipated end-use environment all play a major...

A design engineer’s guide to LED protection

The LED market is one of the fastest-growing sectors in the electronics industry. Due to the...


  • All content Copyright © 2025 Westwick-Farrow Pty Ltd